Alfa Tower






Site is located an Al-Jaffaly old compound - Khobar city.
Excavation depth was about 14.00 m (Four basement)
Excavation works amount 31,000 m3
Soldier pile shoring system was used
Anchoring work for three rows to support shoring system
About 80 anchors were used for the first row
About 80 anchors were used for the second row
About 80 anchors were used for the third row
Dewatering system using well point system for two levels using about 6 dewatering pumps.
Concrete works for the tower (4 basements with walls and 13 floors )